Marcellus lateral project
From Wikimarcellus
Tcopley (Talk | contribs)
(was to have a capacity of 75,000 bbl/d of natural gas liquids (NGLs))
Next diff →
Revision as of 00:03, 31 October 2010
was to have a capacity of 75,000 bbl/d of natural gas liquids (NGLs) expandable up to 175,000 bbl/d.
Much of the NGLs were to be shipped to the Sarnia chemical complex in Ontario, Canada. After reaching Riga, the route taken by the NGL to Sarinia is through the present Cochin system to Windsor, Ontario. From there it is to flow through the Windsor-Sarnia Pipeline to Sarnia.
The flow through the eastern leg of the Cochin pipeline was to be be reversed to transport gas from Riga into Chicago. An additional pipeline was planned in Chicago to connect up chemical plants, fractionation facilities, and refineries in the area.
The pipeline was expected to go online in mid-2010 transporting in excess of 150,000 bbl/d.
In mid-June, 2010, KMEP announced a 30-day open season to gauge interest in its Marcellus lateral project.