Gentilly

From Wikimarcellus

(Difference between revisions)
Jump to: navigation, search
Revision as of 01:20, 29 November 2009
Tcopley (Talk | contribs)
(cop1128)
← Previous diff
Revision as of 20:02, 16 December 2009
Tcopley (Talk | contribs)
(Lowlands JV partners working on 2 wells in Utica horizontal drilling program)
Next diff →
Line 4: Line 4:
dive in and help it grow! dive in and help it grow!
-The '''Gentilly #1''' well was first drilled in 2006 as a Cambrian/Trenton-Black River test, but during 2008 was recompleted as a Utica/Lorraine Shale play well. Initial results during the summer of 2008 indicate a sustained flow rate in excess of 800 mcfd before being shut in. The test well was vertical, but according to management it will most likely be developed as a horizontal well. It is a joint venture of [[Canadian Quantum Energy]], [[Talisman Energy Inc.]] and [[Questerre Energy Corporation]]. The latter company is the operator.+The '''Gentilly #1''' well was first drilled in 2006 as a Cambrian/Trenton-Black River test, but during 2008 was recompleted as a Utica/Lorraine Shale play well. Initial results during the summer of 2008 indicate a sustained flow rate in excess of 800 Mcf/d before being shut in. The test well was vertical, but according to management it will most likely be developed as a horizontal well. It is a joint venture of [[Canadian Quantum Energy]], [[Talisman Energy Inc.]] and [[Questerre Energy Corporation]]. The latter company is the operator.
The well is located 30 km east of Trois-Rivières on the south side of the St. Lawrence River in the Province of Quebec and about 100 km south of Quebec City. The well is located 30 km east of Trois-Rivières on the south side of the St. Lawrence River in the Province of Quebec and about 100 km south of Quebec City.
-In November, 2009 Canadian Quantum announced that it was to participate in the Gentilly #2A HZ, a horizontal well offsetting the original vertical Gentilly #1. Drilling was to commence in December, 2009 and take around 35 days to finish. It was to have a 1,000 meter lateral. The company owns a small percentage of both the working and royalty interests in this well.+In November, 2009 Canadian Quantum announced that it was to participate in the Gentilly #2A HZ, a pilot horizontal well offsetting the original vertical Gentilly #1 to test the Utica shale potential in the St. Lawrence Lowlands. This was the second well in the pilot program. The '[[Questerre Energy Corporation|St. Edouard #1H]] had been first. Drilling was to commence in December, 2009 and take around 35 days to finish. The company owns a small percentage of both the working and royalty interests in this well. '''Update:''' The Gentilly #2A HZ had been spud in mid-December targeting the middle Utica. The well was to be drilled to a depth of 9,567 feet with a 2,625 foot horizontal leg.

Revision as of 20:02, 16 December 2009

Here is where some info about the Gentilly #1 well should go.  
This article is still a stub and needs your attention. It does
not have a template and contains minimal information. Please 
dive in and help it grow!

The Gentilly #1 well was first drilled in 2006 as a Cambrian/Trenton-Black River test, but during 2008 was recompleted as a Utica/Lorraine Shale play well. Initial results during the summer of 2008 indicate a sustained flow rate in excess of 800 Mcf/d before being shut in. The test well was vertical, but according to management it will most likely be developed as a horizontal well. It is a joint venture of Canadian Quantum Energy, Talisman Energy Inc. and Questerre Energy Corporation. The latter company is the operator.

The well is located 30 km east of Trois-Rivières on the south side of the St. Lawrence River in the Province of Quebec and about 100 km south of Quebec City.

In November, 2009 Canadian Quantum announced that it was to participate in the Gentilly #2A HZ, a pilot horizontal well offsetting the original vertical Gentilly #1 to test the Utica shale potential in the St. Lawrence Lowlands. This was the second well in the pilot program. The 'St. Edouard #1H had been first. Drilling was to commence in December, 2009 and take around 35 days to finish. The company owns a small percentage of both the working and royalty interests in this well. Update: The Gentilly #2A HZ had been spud in mid-December targeting the middle Utica. The well was to be drilled to a depth of 9,567 feet with a 2,625 foot horizontal leg.

Personal tools