Gentilly

From Wikimarcellus

(Difference between revisions)
Jump to: navigation, search

Tcopley (Talk | contribs)
(The Gentilly #1 well was first drilled in 2006)
Next diff →

Revision as of 00:45, 5 September 2008

The Gentilly #1 well was first drilled in 2006 as a Cambrian/Trenton-Black River test, but during 2008 was recompleted as a Utica/Lorraine Shale play well. Initial results during the summer of 2008 indicate a sustained flow rate in excess of 800 mcfd before to being shut in. The test well was vertical, but according to management it will moyst likely be developed as a horizontal well. It is a joint venture of Canadian Quantum Energy Corp. and Talisman Energy Inc. The latter company is the operator.

Personal tools