AOP Clearwater

From Wikimarcellus

(Difference between revisions)
Jump to: navigation, search
Revision as of 19:30, 15 February 2009
Tcopley (Talk | contribs)

← Previous diff
Revision as of 19:33, 15 February 2009
Tcopley (Talk | contribs)

Next diff →
Line 5: Line 5:
'''AOP Clearwater''' is building a water treatment plant that will be used to recycle wastewater from Marcellus shale drilling in the Fairmont, West Virginia area. Gas drilling water will be reused as [[Hydro-fracturing|frac]] water. The plant will use ''distillation crystallization'' to to reclaim 80% of the drilling water, with the remaining percentage lost through evaporation. '''AOP Clearwater''' is building a water treatment plant that will be used to recycle wastewater from Marcellus shale drilling in the Fairmont, West Virginia area. Gas drilling water will be reused as [[Hydro-fracturing|frac]] water. The plant will use ''distillation crystallization'' to to reclaim 80% of the drilling water, with the remaining percentage lost through evaporation.
 +
 +The facility, AOP's first, will open in July, 2009.
 +
 +Louis Bonasso is company President.

Revision as of 19:33, 15 February 2009

Here is where some info about AOP Clearwater
should go.  This article is still a stub and needs your
attention. It does not have a template and contains minimal
information. Please dive in and help it grow!

AOP Clearwater is building a water treatment plant that will be used to recycle wastewater from Marcellus shale drilling in the Fairmont, West Virginia area. Gas drilling water will be reused as frac water. The plant will use distillation crystallization to to reclaim 80% of the drilling water, with the remaining percentage lost through evaporation.

The facility, AOP's first, will open in July, 2009.

Louis Bonasso is company President.

Personal tools