Range Resources

From Wikimarcellus

(Difference between revisions)
Jump to: navigation, search
Revision as of 21:12, 8 July 2010
Tcopley (Talk | contribs)
(Westmoreland County Plans - Allegheny County Plans)
← Previous diff
Revision as of 21:17, 8 July 2010
Tcopley (Talk | contribs)
(Chuck Moyer)
Next diff →
Line 153: Line 153:
* Carl J. Carlson is Director of Government Affairs. * Carl J. Carlson is Director of Government Affairs.
* Matt Pitzarella is Director of Public Affairs. * Matt Pitzarella is Director of Public Affairs.
 +* Chuck Moyer is Geology Manager.
* Dave Schieck is a geophysicist with the company. * Dave Schieck is a geophysicist with the company.
* Mike Forgione is Senior Engineer, Appalachian Basin Office. * Mike Forgione is Senior Engineer, Appalachian Basin Office.

Revision as of 21:17, 8 July 2010

washington_co_rig_sm.gif
Drilling rig in rural Washington Co., PA
Photo credit - donnan.com

Range Resources Corp. (NYSE: RRC) of Ft. Worth, TX is the biggest natural gas producer in Pennsylvania, and it is one of the largest drillers in the U.S. Between 2005 and 2008, counting all drilling and infrastructure costs, its total investment in the Marcellus shale play approached $700 million. It had the distinction of having started the Marcellus shale play when it first drilled a well in southwest Pennsylvania's Washington County. It began producing in 2005. By July, 2009 Range was reporting that its Marcellus investment had exceeded $1 billion. As of February, 2010 its leasehold in the Marcellus shale fairway was reported to be 900,000 acres.

Contents

Latest operating results

An October, 2009 company update indicated that Range had drilled 77 horizontal Marcellus shale wells so far during 2009. 60 of these had been completed and 54 were on production. The company planned to drill and case 20 additional Marcellus wells before year-end 2009. Approximately 20 wells were to be carried over into 2010 for completion. A few months later in February, 2010, the company reported that it had actually drilled 31 horizontal wells during the fourth quarter of 2009. 26 of these remained to be completed, and of the 5 completed ones, all still awaited a pipeline hookup. Update: By April, 2010 Range was reporting that it had drilled 120 horizontal Marcellus wells, 31 were awaiting completion, and 8 still needed to be hooked up.

In July 2009 the company had forecasted its overall average yield, that is, the average estimated ultimate recovery (“EUR”) to be 4.4 Bcf of natural gas (gross) over the lifetime of each Marcellus shale well. This was based upon 2.5 years of drilling experience in the southwestern part of the play. Update: Based on 3 years experience the company announced in April, 2010 that it was increasing its EUR for a Marcellus well in the southwestern Pennsylvania portion of the play by .6 Bcf to 5.0 Bcf. This assumed an average of a 3,056 foot lateral and 10 stage completion. The EURs for all of Range's high-graded acreage were also to be increased up from 3 to 4 Bcf to 4 to 5 Bcf. These increases were attributed to the utilization of longer laterals and more frac stages resulting in improved economics, higher initial production (IP) rates, and higher overall EURs. These results mirror similar findings in other shale plays.

The cost of drilling and completing these wells was estimated to be around $3.5 million each. Range stated that after deducting an average royalty paid to the landowner of 15%, the company's net exploration and development costs ran less than $1.00 per mcfe.

In order to generate even greater well productivity, during the fourth quarter, 2009, Range had been experimenting with longer laterals ranging up to 5,000 feet in length instead of shorter ones used previously between 2,200 and 2,800 feet. In addition, it was using a greater number of frac stages than earlier with anywhere from 9 to 17 stages. (Note: See Update above for impact on EUR.)

In the aforementioned October report, Range stated that its Marcellus production had increased to 80 Mmcfe/d. At the time, the company was expecting this number to be at the high end of a planned range of 80 to 100 Mmcfe/d by the end of the year. However, by February, 2010 the company was reporting actual production to have swollen to approximately 115 Mmcfe/d. In April, 2010, Range announced that it expected to reach 180 to 200 Mmcfe/d by year-end.

According to the previously mentioned February, 2010 update, the company planned to drill 150 horizontal wells during 2010. It had fielded 13 rigs in its Marcellus division. By year-end the horizontal rig count was planned to grow to 16. Several of these rigs were of the custom-built variety.

During the fourth quarter of 2009, the company had finished drilling its first two Lycoming County horizontal Marcellus shale wells in the northeast portion of the play. These were offsetting two very productive vertical wells. The first of these wells had initial 7-day average production of 13.3 Mmcfe/d. The second one yielded 13.6 Mmcfe/d. Both wells had been shut-in and were awaiting pipeline hook-up in late 2010 or early 2011.

Also during the fourth quarter, Range had finished drilling a Utica shale well and an Upper Devonian one. The Utica well had been completed and was in the process of being tested. The Devonian one still awaited completion. Update: By April, 2010 the company was reporting that it was continuing its evaluation, results from both wells were "encouraging," and both were awaiting pipeline hookup.

By year-end 2009, gross cryogenic gas processing capacity had risen to 155 Mmcf/d in the high BTU portion of the play. An additional 30 Mmcf/d was planned to be added by mid-year 2010. In the dry gas portion of the play, Range had in place 160 Mmcf/d of pipeline tap capacity and 20 Mmcf/d of compression capacity. Additional compression capacity was to be added as needed. Update: In April, 2010 the company announced that it had entered into an agreement with a third party in Lycoming Co., PA to build a dry gas pipeline and compression facility in several stages. The first stage was to be completed and online by the end of 2010.

2008 Development Timeline

As the granddaddy of Marcellus shale drilling, Range invested $426 million in Appalachia during 2008. By April, 2008, it had drilled 12 horizontal wells. Once completed, six of these had produced an average of 5 Mmcf/day. That compares quite favorably with drilling results from the Barnett shale play in North Texas, recognized to date as being the largest natural gas-producing field in the U.S. The Marcellus shale formation is strategically located close to America's gas-consuming east coast cities. The formation's advantageous location translates into very favorable market prices for its gas.

In April, 2008 it was reported that Range had drilled three wells in Lycoming County, Pennsylvania and planned a fourth one there. Range has a field office on Sycamore Road in Montoursville, a suburb of Williamsport in Lycoming County.

Expanding Marcellus shale leasehold

By October, 2008 the company was reporting that it had drilled one hundred-thirty wells in the Appalachian Basin. One hundred had been vertical and thirty were horizontal ones. This same report indicated Range had leased drilling rights on 900,000 acres of land in Pennsylvania.

  • 550,000 acres in southwest PA
  • 350,000 in northeast

The company's total Appalachian Basin leasehold is 2.3 million net acres with 1.4 million of it prospective for Marcellus shale drilling. Its acreage is located in southwest Pennsylvania, northeast Pennsylvania and southern New York State.

Northeastern Pennsylvania activities

In September, 2008, Range was reported to be actively drilling in the Susquehanna Basin of Pennsylvania. It paid a fine to the Susquehanna River Basin Commission of $475,000 for failing to comply with water withdrawal limits for wells in the Basin.

According to an October, 2008 report the company had recorded 172 leases during 2008 with the Bradford County Registrar of Deeds. Bradford County is located in northeastern Pennsylvania.

rrc_rig.gif
Appalachian fall colors backdrop Range rig
Image courtesy of Range Resources

Southwestern Pennsylvania activities

Also in September, 2008, Range had been actively leasing drilling rights in Greene County located in the southwest corner of Pennsylvania.

Another October, 2008 report indicated that Range was heavily involved in Washington County in southwestern Pennsylvania. In 2003, it had drilled a test well in the County's 2,700-acre Cross Creek Park that had been successful. By 2008, three gas wells in the park were producing 30 Mmcf/d.

In November, 2008, Range was reported drilling on the John Dunn farm near Houston, Pennsylvania in Washington County. Two gas processing plants were under construction on State Route 519, three miles north of Houston. These plants are discussed below.

2009 Development Timeline

A few miles to the northwest of Houston, PA in rural Mt. Pleasant Township, it was reported in March, 2009 that Range had drilled 68 wells. For example, Range had drilled on the 133 acre Joyce Mitchell farm in nearby Hickory, PA. In July, 2009, a company spokesman noted that Range had been responsible for making five millionaires--presumably royalty owners--in Mr. Pleasant.

Range was also evaluating a test well in Jefferson County, Ohio located roughly forty miles west of Pittsburgh, PA.

In March, 2009 Range conducted seismic testing in collaboration with Conquest Seismic Services to the north of Pittsburgh in Beaver County, Pennsylvania. According to the report filed, Conquest had wired 13 miles of state road west of the Beaver Valley Expressway with acoustic sensors.

Outstanding drilling results

Also in March, 2009 Range reported several Marcellus shale operating highlights which included:

  • One well with a flow rate to sales of 10.3 Mmcfe/d.
  • Four out of the last eleven wells drilled had initial flow rates in excess of 9.9 Mmcfe/d.
  • The best well had an initial rate of 24.5 Mmcfe/d.
  • Two vertical wells in the northeastern section of the Marcellus play with initial flow rates of 2.3 Mmcfe/d and 6.3 Mmcfe/d. The latter was the highest initial rate ever recorded for a vertical Marcellus well.
  • Since October, 2008 13 new wells had been brought online to the gas processing facility. These wells averaged 6.9 Mmcfe/d.
  • 14 wells had been completed--seven were horizontal and already fraced. All 14 were awaiting hook-up to the gas processing facility.
  • Range had planned to drill 60 new Marcellus wells during 2009. (see July, 2009 update below).

Washington County gas processing infrastructure

Mark West Energy built and maintains a gas gathering system as well as compression facilities for Range's Marcellus production. This infrastructure also includes refrigeration and cryogenic processing plants. One of these plants is located in Chartiers Township in Washington County. On the outskirts of Hickory, located about 15 miles north of Chartiers, there is a three-acre reservoir for drilling water, a gas compressor station, and a liquid extraction plant. As of April, 2009 Range's Washington County wells were starting to come on stream with these plants which had capacity to process 60 Mmcf/d. The company continues to expand its processing capability in Washington County and expected to produce 200 Mmcf/d by year-end 2009 or early 2010.

Crawler rigs

In an operational update provided in April, 2009 the company mentioned that it was in the process of acquiring six new custom-designed Marcellus shale drilling rigs. Two had already been delivered and were in use. These rigs have crawlers that can traverse a drilling pad in a few hours compared to several days taken by older rigs. Range typically drills several laterals on a single pad, so these new rigs are much for efficient.

In a separate April, 2009 report it was mentioned that Range will be introducing the so-called Drake Rig built by National Oilwell Varco for Marcellus shale drilling in Pennsylvania. It was not clear from the report whether these are the same new rigs referred to in the above paragraph.

It was mentioned in yet another April update that Range had two new horizontal Marcellus wells. The first had an initial flow rate of 7.9 Mmcfe/d and the second had initial flow of 10.7 Mmcfe/d.

Bradford County plans

An April, 2009 update from the company indicated that Range had 40,000 acres under lease in Bradford County, but had not yet started drilling there. Instead, it was focusing on developing its leases in southwestern Pennsylvania where it had better pipeline infrastructure. A company rep expressed doubt that drilling would begin in Bradford Co. during 2009, but said it eventually would once the company had built up its pipeline infrastructure in this area. A subsequent report indicated that Range planned to begin a drilling program in 2010 with three rigs operating in both Bradford and Lycoming Counties. This drilling was to supersede Ranges's existing vertical drilling program in northeastern PA.

Cross Creek Park contamination issues

Cross Creek Park again appeared in the news in June, 2009 when the Pennsylvania Department of Environmental Protection (DEP) was considering a possible enforcement action against Range over apparent toxic drainage from a leaky coupling on a six inch waste water pipe that ran from a recently drilled well to an impoundment area. Reportedly, there had been a fish, salamander, crayfish and aquatic insect kill in about three-quarters of a mile of stream leading into Cross Creek Lake. DEP was taking water samples both above and below the point where drainage from the leaky coupling entered the stream in order to be analyzed as one aspect of their investigation. A company spokesperson indicated a vandal may have been to blame for the problem.

Cecil Township office facility

According to a July, 2009 report, Range had first opened an office with only one employee in January, 2007 in Washington County's Cecil Township. By the summer of 2009, the office had grown to 130 people. It is located about four miles north of Cannonsburg, PA.

Range's Appalachian Division Headquarters is located in Southpointe Office Park in Cecil, Washington County, Pennsylvania.

Leasing in Pittsburgh's suburbs

hickory_flare.gif
Range Resources' well in suburban area being flared after hydro-fracturing
Photo credit -www.marcellus-shale.us

In the late spring of 2009 reports began circulating that Range had been actively leasing in the western suburban areas of Greater Pittsburgh. This came to light in August, 2009 when Allegheny County's Collier Township Commissioners had voted to advertise an ordinance restricting drilling to only three areas:

  • The Campbell's Run corridor
  • The hollow by Lane Block in Fort Pitt
  • The industrial district on Meyer St. in Kirwn Heights

This ordinance had not passed, but rather was referred back to the township planning commission for additional review. An earlier report from May, 2009 noted that courts had been ruling against ordinances to restrict drilling such as happened in Salem Township in Westmoreland County. Blaine Township in Washington County had also been involved in a federal lawsuit brought by a gas company for passing an ordinance that attempted to regulate drillers. The Pennsylvania Department of Environmental Protection has generally been held as the agency to be in charge of permitting gas wells and monitoring drilling.

Drilling test well in Beaver County

In late November, Range came to notice when its drilling subcontractor, Patterson, set up a 168 foot rig off Hartzel School Road in Beaver County's Marion Township in southwestern Pennsylvania. This was Range's first well in Beaver Co., and it appeared to be a test one. Drilling on it was planned to conclude sometime in January, 2010. The well was not specifically identified as targeting the Marcellus shale, yet it was noted that it was to be horizontal and fraced--these facts are quite consistent with drilling a Marcellus shale well.

2010 Development Timeline

Westmoreland County Plans

In May, 2010 a news item appeared regarding plans Range had for drilling in Westmoreland Co., east of Pittsburgh, PA, near the intersection of Logans Ferry Road and Route 380 north of the borough of Murrysville and east of Boyce Park.

Allegheny County Plans

A news item appeared in July, 2010 regarding plans Range had to drill with parter, Huntley & Huntley, along Yutes Run Road in Allegheny County's Frazer Township northeast of Pittsburgh, PA. Pittsburgh Mills shopping center complex is also located in Frazer Twp.

The two companies planned to drill a 3,000 to 4,000 foot lateral from an existing vertical well at a depth of 7,000 feet.

Range was said to be seeking other sites in the Frazer area to drill.

Huron shale developments

Range has also been actively drilling in the Huron shale formation in Virginia. It had recently drilled four horizontal wells in Virginia's Nora Field. As of April, 2009, It had a total of eight producing horizontal wells in the play with average production of 1.1 Mmcf/d. The company planned to drill 20 horizontal Huron shale wells in the Nora field. Range owns a 50% working interest there. It had been drilling a combination of coal-bed methane and tight gas wells in this field. According to its July, 2009 update, the company had drilled three more horizontal Huron shale wells during the second quarter of 2009.

In April, 2009 Range announced its best Huron well ever which had averaged 3.0 Mmcf/d for the previous 30 days.

By October, 2009 the company stated in an update that during the third quarter of 2009, it had drilled 5 more horizontal Huron shale wells in the Nora field. It also drilled three other horizontals in the Big Lime and Berea zones there. So far during the year 15 horizontal wells had been drilled in all three zones and 10 of these were on production and meeting expectations.

The fourth quarter of 2009 saw another 4 Huron shale wells drilled and 1 Big Lime one. 19 wells had been completed in these target zones during 2009, and all were performing up to the company's expectations.

Spotlighted Issues

  • Range has had tremendous production results from its southwestern Pennsylvania Marcellus leasehold. With three rigs operating in the region, 2010 will begin to demonstrate how productive the company can be in the northeastern Pennsylvania Counties of Bradford and Lycoming.
  • The company endeavored to build up its pipeline and processing capability in southwestern Pennsylvania in partnership with MarkWest, and that appears to be coming together on schedule.
  • Range, by experimenting with longer laterals and more frac stages, was enjoying positive learning curve economics as it gained increasing experience in the play. These improvements in technique were leading to higher initial production (IP) and expected ultimate recovery (EUR) per well.

Executive Contacts

  • John H. Pinkerton is Chairman and CEO of Range Resources.
  • Jeffrey L. Ventura is President and COO.
  • Rodney Waller is Senior Vice President of Appalachia Shale.
  • Chad Stephens is a Senior Vice President.
  • William Zagorski is Vice President of Geology and one of the earliest proponents of Marcellus shale drilling.
  • Ray N. Walker, Jr. is Vice President of Appalachia Shale.
  • K. Scott Roy is Vice President of Government and Regulatory Affairs.
  • Joseph Frantz Jr. is Vice President of Engineering for Marcellus Shale Operations.
  • Carl J. Carlson is Director of Government Affairs.
  • Matt Pitzarella is Director of Public Affairs.
  • Chuck Moyer is Geology Manager.
  • Dave Schieck is a geophysicist with the company.
  • Mike Forgione is Senior Engineer, Appalachian Basin Office.
  • David Amend, is Investor Relations Manager.
  • Karen Giles is Manager of Corporate Communications.
  • Steve Rupert, Ralph Tijerina and Carl Carlson are Pittsburgh area spokesmen for Range.
  • Jim Cannon is a Range Public Relations Specialist and spokesman in Beaver Co., PA