Keystone Pipeline
From Wikimarcellus
(Difference between revisions)
Revision as of 20:15, 18 September 2008 Tcopley (Talk | contribs) (added stub) ← Previous diff |
Revision as of 20:28, 18 September 2008 Tcopley (Talk | contribs) (280 mile proposed pipeline) Next diff → |
||
Line 3: | Line 3: | ||
attention. It does not have a template and contains minimal | attention. It does not have a template and contains minimal | ||
information. Please dive in and help it grow! | information. Please dive in and help it grow! | ||
+ | |||
+ | The '''Keystone Pipeline''' is a 280 mile proposed pipeline that will begin in Greene County and end in Chester County, Pennsylvania. The preliminary schedule calls for a starting date in the spring of 2011. | ||
+ | |||
+ | It will have a 36-inch-diameter pipe. | ||
+ | |||
+ | The pipeline will ship Marcellus shale formation gas to northeastern population centers. Dominion controls owns drilling rights to about 600,000 to 800,000 acres of prospective shale. Dominion has assigned about one-third of these rights to [[Antero Resources]]. | ||
+ | |||
+ | Contact: Steve Armentrout, Project Engineer |
Revision as of 20:28, 18 September 2008
Here is where some info about the Keystone Pipeline should go. This article is still a stub and needs your attention. It does not have a template and contains minimal information. Please dive in and help it grow!
The Keystone Pipeline is a 280 mile proposed pipeline that will begin in Greene County and end in Chester County, Pennsylvania. The preliminary schedule calls for a starting date in the spring of 2011.
It will have a 36-inch-diameter pipe.
The pipeline will ship Marcellus shale formation gas to northeastern population centers. Dominion controls owns drilling rights to about 600,000 to 800,000 acres of prospective shale. Dominion has assigned about one-third of these rights to Antero Resources.
Contact: Steve Armentrout, Project Engineer